Project info

Overview

The client had approached us as they had an extremely tight deadline to undertake a complete refurbishment of their existing main conference facility and with only a 6 week window available. This was achievable by Trefoil Interiors having complete control of all works involved.

All existing finishes, external windows, structural viewing area and M&E services were fully stripped out to take the area back to a shell in readiness for its transformation. We fully designed and installed a new Aurora LED dimmable lighting system throughout, all of which can be operated through a smart data hub, along with providing new power. All existing block walls throughout were fully dry-lined, plaster skimmed and decorated, whilst a new 740m2 acoustically designed Rockfon suspended ceiling system was installed to meet the strict acoustic criteria of the multi-functional area.

All external doors and windows were replaced with new triple glazed aluminium systems, along with a brand new staging system and fabric wrapped back surround. All works were comfortably completed within 5 weeks, providing the client an additional weeks’ grace.

Putting trust in a contractor to deliver a project on time and budget is a big thing. Trefoil kept everything on track and absorbed any unforeseen extra work. They worked with professionalism and to a high standard. I’d have no hesitation in recommending them.
Mark Smethurst
Operations Manager, All Nations Church